top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

Sandbanks to Swanage Ferry Biannual Refurbishment

We returned back on to the Sandbanks to Swanage Chain Ferry. This time it is for the biannual refurbishment. During this refurbishment, the team:

- Installed new capacitance level sensors on the hydraulic oil tanks to alarm against low oil levels, thus avoiding costly down time.
- Installed and commissioned Parker I-count Oil particle contamination monitor on each hydraulic pump, to give warning against degrading oil quality.
- Re-wired and tidied up the existing drive panel and alarm panel, including all 24 of the relays within the drive panel.
- Created new drawings and a cable list for the existing drive panel and alarm panel.
- Re-wired and upgraded the controls in both the North and South control cabins.
- Programmed the Pro-Faces HMIs to act as alarm monitors, graphical representation of Oil ISO levels from I-Count units, act as process indicators to monitor Oil temperature, pressure and alarm set points.

  • Instagram
  • Linkedin

Contact Us

Location:

Unit 3, Cornmill Road

Evesham

Worcestershire

WR11 2LL

United Kingdom

01386 421350

© 2035 by Newel Residential Remodeling. Powered and secured by Wix

GET IN TOUCH

Thanks for submitting!

bottom of page